Rental rehab budget

Price the work, add a contingency and track spending against your estimate. Keep unfinished work visible as costs come in.

Free to use. No account needed.

Download Excel template

Paint rooms

Line estimate$1,750.00
Category & notes

LVP flooring (sq ft)

Line estimate$3,600.00
Category & notes

Appliance package

Line estimate$2,400.00
Category & notes

Cleanup and hauling

Line estimate$500.00
Category & notes

Leave actual paid blank until recorded. Include labor, materials, permits and taxes in your costs.

Example data. Edit it or start a blank worksheet.

Worksheet entries stay in this browser and your downloads. Browser drafts are stored on this device and are not synced to your account.

Example rental refresh

Estimated and recorded project costs

Itemized rehab budget
ItemCategoryQuantityUnit estimateLine estimateActual paidVariance
Paint roomsInterior5$350.00$1,750.00$1,650.00-$100.00
LVP flooring (sq ft)Flooring800$4.50$3,600.00Not enteredNot entered
Appliance packageKitchen1$2,400.00$2,400.00Not enteredNot entered
Cleanup and haulingExterior1$500.00$500.00$600.00$100.00

LVP flooring (sq ft): Installed price

Working with this worksheet

What should a rental rehab budget include?

Enter the full cost of making the property rent-ready: materials, labor, demolition, hauling, permits and applicable taxes. Add separate rows for costs that do not fit a unit price. Holding costs and lost rent matter too; include them where appropriate, then avoid counting them again in another budget.

How does contingency work?

Contingency is a percentage of the base estimate. It adds room for unknown work and price changes; it is not added to each actual payment. Choose a percentage based on the condition of the property and the certainty of the scope and bids.

Why is a blank actual different from zero?

A blank actual means spending has not been recorded for that item. An entered zero is a recorded amount. Variance compares actual spending only with estimates on lines that have actuals, so unfinished work does not look like a saving.

Does remaining budget tell me what it will cost to finish?

No. Remaining budget is the total budget minus recorded spending. It may be more or less than the cost of unfinished work. The estimate without actuals helps identify work to review, but partial payments, changes and outstanding invoices still need your attention.

How does the budget carry into the analyzer?

The analyzer link uses the full budget, including contingency, as initial repairs and renovations. Other inputs start from the analyzer’s example. Review the price, rent, financing and operating costs before using its cash flow or return figures.

Planning and recordkeeping tools. Verify inputs and outputs before acting. Terms & privacy.

The Rental Wire · therentalwire.com/rental_rehab_budget.html
Based on the entries supplied. Verify against your records. This worksheet does not determine tax treatment or replace professional advice.